TOPWET refurbishment vent determined for connection to sewerage ventilation piping with an integrated custom made sleeve (EPDM, TPO, FPO, PR, STE - suitable for cold liquid applied applications) including a rain cap. A height above insulation of 300 mm (max. 500mm), a height below insulation of 200 mm (max. 1000 mm).
For connection to piping of diameter | ||
---|---|---|
TWOP SAN 50 ___ | 54–72 mm |
Drawing documentation |
TWOP SAN 75 ___ | 79–102 mm |
Drawing documentation |
TWOP SAN 90 ___ | 99–106 mm |
Drawing documentation |
TWOP SAN 110 ___ | 116–129 mm |
Drawing documentation |
TWOP SAN 125 ___ | 144–154 mm |
Drawing documentation |
TWOP SAN 160 ___ | 186–200 mm |
Drawing documentation |